 |
Retrofit of exterior Casino lighting. |
 |
Reduced density of Big Oak Housing Project
(proposed 37, built 8). |
 |
Sloane Canyon public trail improvements.
|
 |
Sloane Canyon cleanup. Removed vagrants
and prohibited illegal off-road vehicle activity. |
 |
Widening of Dehesa Road at the main entrance
to the Reservation to enhance traffic safety. |
 |
Assisted the California Highway Patrol
with the purchase of speed control trailers in front of
Dehesa School. |
 |
Installed electronic speed signs near
Dehesa School to help better identify the “school
zone”. |
 |
Constructed a left turn lane at Dehesa
School to enhance the flow of traffic. |
 |
Extension of a natural gas line to serve
the community. |
 |
Extension of cable TV service line to
serve the community. |
 |
Funded extension of water service line. |
 |
Brush clearing for fire prevention. |
 |
Parking structure mitigation – re-vegetation
of valet parking lot as natural habitat. |
 |
Contributions to Dehesa Dollars for Scholars. |
 |
Annual funding for Dehesa School’s
6th grade camp at Catalina Island. |
 |
Currently studying additional turn lanes
at Dehesa Road and Sycuan Square. |
 |
Currently studying additional turn lane
at Casino Way. |